home
Répertoires disponibles

Guidance page for practical work 9: electricity production from geothermal energy (setting out)

Last modified: 04/25/2012 10:26 AM
This document is an excerpt from the guidance page with complete results, which is reserved for teachers. For this reason, the numbering of figures is flawed.

The project objective is to study the operation of power plants using geothermal energy and show how to model them realistically with Thermoptim.

 

You will find below the document in pdf format.

Hosted by Center for Energy and Processes of Ecole des Mines de Paris -This site is powered by Zope,CPS, which includes CPSSkins.